Explaining the Gap between the Promise and Practice of 5D BIM implementation
Loading...
Author (Corporation)
Publication date
09.09.2026
Type of student thesis
Course of study
Collections
Type
04B - Conference paper
Editors
Editor (Corporation)
Supervisor
Parent work
ECPPM 2026 – European Conference on Product and Process Modelling
Special issue
DOI of the original publication
Related research data
Series
Series number
Volume
Issue / Number
Pages / Duration
Patent number
Publisher / Publishing institution
Zenodo
Place of publication / Event location
Cardiff, United Kingdom
Edition
Version
Programming language
Assignee
Practice partner / Client
Abstract
Cost management remains a challenge in the Architecture, Engineering, and Construction (AEC) industry, as cost estimation, budgeting, and control depend on fragmented information, heterogeneous stakeholder responsibilities, and discontinuous processes across the project life cycle. Although 5D BIM (Building Information Modelling) promises improved quantity take-off, cost visualization, and decision support, its practical implementation often falls short of the benefits demonstrated in isolated or experimental settings. This paper investigates why the continuous use of BIM for cost planning, cost estimating, and cost management has not yet become common practice. The study adopts a qualitative exploratory case study design based on semi-structured interviews with representatives of clients, designers, contractors, general contractors, and specialist firms in the context of German AEC industry. The empirical data were analysed using a deductive–inductive category system informed by the DeLone and McLean information systems success model. The findings show that technological advances in 5D BIM coexist with persistent discontinuities in cost management processes. In particular, limited reuse of model-based cost data and differences in the definition and interpretation of cost-relevant information restrict implementation across project phases and stakeholder boundaries. The paper contributes to product and process modelling in the built environment by explaining semantic interoperability as a central condition for integrating model-based information systems into practical cost management workflows.
Keywords
cost management, BIM implementation, information systems, exploratory case study, interoperability, German AEC industry
Subject (DDC)
Event
ECPPM 2026 – European Conference on Product and Process Modelling
Exhibition start date
Exhibition end date
Conference start date
09.09.2026
Conference end date
11.09.2026
Date of the last check
ISBN
ISSN
Language
English
Created during FHNW affiliation
Yes
Strategic action fields FHNW
New Work
Publication status
Published
Review
peer-reviewed
Open access category
Green
Citation
Nast, A., Merschbrock, C., & Walzer, A. (2026, September 9). Explaining the Gap between the Promise and Practice of 5D BIM implementation. ECPPM 2026 – European Conference on Product and Process Modelling. ECPPM 2026 – European Conference on Product and Process Modelling. https://doi.org/10.5281/zenodo.22679598